Dispensing · Potting · Fastening · Soldering

Six questions that come up before every order

These are the questions that come up most often during quotation. If yours is not here, call or write — we answer within one working day.

Questions

Equipment, process and commercial terms

What is the difference between a dispensing machine and a potting machine?

A dispensing machine places a controlled dot, bead or pattern of adhesive on a surface — bonding, sealing, conformal coating or gasketing. A potting machine fills a cavity or housing with a two-component resin to encapsulate a component. Potting requires metered mixing of resin and hardener at a fixed ratio plus degassing; dispensing usually handles a single-component material.

Can you build a machine for a part that is not standard?

Yes — non-standard is the majority of our work. We start from your drawing or a physical sample, define fixture, axis envelope, valve or pump, and control sequence, then quote a fixed price. Custom dispensing, potting and fastening systems typically ship in 7–15 days after drawing approval. That window excludes the procurement lead time for specified-brand sensors, guide rails and other special-order components.

Which adhesives can your equipment handle?

Hot-melt, neoprene (yellow contact), silicone, cyanoacrylate (instant), epoxy, polyurethane, UV-curable, anaerobic and conductive adhesives, plus solder paste and flux. Valve selection follows viscosity and filler content: time-pressure for low-viscosity fluids, screw or progressive-cavity pumps for filled materials, jet valves for high-speed non-contact work.

Do you provide samples or process validation before we buy?

We run your part and adhesive on a comparable platform and return video, bead measurement and cycle-time data. The run itself is free — you cover freight both ways. An NDA can be signed before you send the part, and drawings are used for this run only.

What about voltage, language and export documentation?

Machines are built for 220 V/50 Hz, 220 V/60 Hz, 110 V/60 Hz or 380 V three-phase as required. HMI and manuals are available in English and Chinese. For export we supply commercial invoice, packing list and certificate of origin. Please confirm the conformity requirements of your destination market before ordering — we build to the voltage and documentation you specify.

How is the machine supported after delivery?

Remote commissioning over video is included. Spare parts — valves, nozzles, tubing, sensors, drivers — are stocked for current models. On-site service and operator training can be arranged; response to a technical question is normally within one working day.

Send us a part. We will send back a process.

Share your workpiece drawing, adhesive datasheet and target cycle time. Our application team responds within one working day with a recommended platform and an indicative price.